Yosemite National Park Tuesday, January 30th, 2018

January 30, 2018  •  Leave a Comment

Daily Report - Yosemite National Park

Tuesday, January 30th, 2018

 

Yosemite National Park Zone Forecast

Today: Mostly sunny. Highs 61 to 71 at 5000 feet...50 to 60 at 8000 feet. Over higher elevations, southwest winds around 25 mph with gusts to around 40 mph in the afternoon.

Tonight: Mostly clear. Lows 36 to 46 at 5000 feet...27 to 37 at 8000 feet.

Tomorrow: Sunny. Highs 57 to 65 at 5000 feet...50 to 56 at 8000 feet.

 

Additional Point Forecast Weather Links:

Yosemite Valley  |  Wawona  |  Tuolumne Meadows  |  Glacier Point |  Big Oak Flat  |  Hetch Hetchy  |  El Portal  |  Mariposa | Badger Pass

 

=======================================================

 

NEW AND HAPPENING TODAY

 

Mist Trail

The Mist Trail from the JMT junction just above the Vernal Fall Footbridge to the top of Vernal Fall has reopened. The JMT from Clark Point to the Panoramic will remain closed.  (

J. Hoeflich)

 

=======================================================

 

RECENT NEWS

 

Yosemite Rockfall Year in Review:  2017

There many large and consequential rockfalls in Yosemite in 2017, with a record 85 events (including rockfalls, rockslides, and debris flows) documented. The cumulative volume of these events was about 36,800 cubic meters. Although this is not the largest annual volume recorded, greater volumes in previous years were typically dominated by one very large event (for example, the 46,700 cubic meter rockfall from Ahwiyah Point in 2009), whereas the cumulative volume for 2017 resulted from several large and medium-sized rockfalls. 

 

The largest event in 2017 almost escaped notice. On the stormy morning of January 12, road crews encountered downed trees and a damaged manhole on the road between Pohono Bridge and the Big Oak Flat Road junction. They also noticed a suspiciously fresh-looking boulder in the Merced River. Subsequent investigation revealed that the boulder was part of a very large rockslide that originated far above the road in an area known (appropriately) as “The Rockslides”. The total volume of this slide was about 20,000 cubic meters (almost 60,000 tons), most of which was scattered throughout the forested slopes above the road. If not for the single boulder that hit the road, this rockslide might have escaped notice for some time.

 

Much greater road damage occurred on June 12, when about 650 cubic meters (nearly 2,000 tons) of rock fell from “Parkline Slab”, a sloping cliff just east of the park boundary near El Portal. About one-third of the rock debris landed on the El Portal Road, burying a 60 meter (200 foot)-long section of road under tons of rock; fortunately, there were no cars directly under this area, despite the rockfall occurring around noon during the busy summer season. The road was closed for five days as crews cleared debris and repaired the roadbed. Much loose debris remains on the slope above the road, and could continue to slide during intense rainstorms.

 

The year’s most consequential rockfalls occurred from the southeast face of El Capitan in September. The first of these occurred at 1:52 pm on September 27, when 290 cubic meters (860 tons) of rock fell from the cliff near the path of Horsetail Fall. Two rock climbers were walking along the base of the cliff directly under the area, and, sadly, one of them was killed and the other seriously injured. YOSAR quickly extracted both climbers, as several more rockfalls totaling 163 cubic meters (440 tons) pummeled the base of the cliff over the next few hours. At 3:21 pm the following day (September 28), a much larger rockfall occurred from the same location. This rockfall, totaling 10,324 cubic meters (27,875 tons), buried trees at the base of the cliff and generated a huge dust cloud that fanned out across the valley. A small rock fragment hit a vehicle traveling on Northside Drive, puncturing the sunroof and injuring the driver. Northside Drive was closed for 24 hours as geologists assessed the potential for additional activity. Several smaller rockfalls occurred from this same area in October and November.

 

Other substantial rockfalls in 2017 occurred at Little Windy Point on the El Portal Road, Ahwiyah Point, Glacier Point, El Capitan, Middle Cathedral Rock, and Hetch Hetchy. 

 

It is very likely that there were additional rockfalls and rockslides in 2017, but these events either were not witnessed or went unreported. If you witness a rockfall of any size, encounter fresh rock debris, or hear cracking or popping sounds emanating from the cliffs, please contact park geologist Greg Stock at 209-379-1420 or greg_stock@nps.gov, or contact Park Dispatch by dialing 911 within the park. Documented rockfalls are added to the park database (http://pubs.usgs.gov/ds/746/), enabling long-term evaluation of rockfall activity to improve public safety.  (G. Stock)

______________________

 

For Rent Available Immediately

3br/2bath 2 car garage 1880 sq ft home in gated community within City of Mariposa.  All appliances included. Central a/c & heat.  Pets negotiable with deposit.  Rent $1500.00/month.  First/last month plus $3000.00 security deposit.  Minimum 1 year lease.  Contact  510 912-554 or earl.hibler@gmail.com  (E. Hibler)

______________________

 

House for Rent

3 bedroom 2 bath home on East Whitlock Road available starting February 1, 2018. $1500 per month not including utilities. Laundry facilities included. One year lease preferred. No pets/smokers. Call Billy at 209-628-5761 for more information.  (B. Bryan)

 

=======================================================

 

CONSTRUCTION & TRAFFIC DELAYS

 

Art Center Demolition

The AAC demolition is completed except for the sand removal under the building. This will require a contract modification and so the project is on hold until the modification is completed by PWR, likely in late January - early February. Completion of the sand removal is expected by early February.  (D. Miller)

_______________________

 

Museum/District Building Electrical Rehab Project

This project will rehabilitate the electrical system in the Museum/District Building by installing grounding in the existing electrical circuits. The Contractor mobilized on Monday, December 18th and the project is expected to run for 6 months. The 8 parking stalls to the west of the building between the sidewalk on the south and the south end of the fence to the north will become the Contractor's staging areas.  Please do not leave any vehicles parked there on Sunday night. Thank you.  (K. White)


Comments

No comments posted.
Loading...

Archive
January February (14) March April May June July August September October November December
January February March April May June July August September October November December
January February March April May June July August September October November December
January February March April May June July August September October November December (12)
January February March April May June July August September October November December
January (22) February (18) March April May June July August September October November December